How this site sources its figures
The Bay Area is short on published colocation prices. Most operators here quote privately. So this site works with what is actually in print and marks the gaps.
- List prices come from two providers that publish them, one in San Francisco and one in Fremont. One of the two is a promotion, labeled as such.
- Ranges come from QuoteColo, a broker, for San Jose. A broker's range reflects the deals that broker sees. It is useful as a bracket and should not be read as any one building's price.
- Utility and grid facts come from a Silicon Valley Power director's remarks as reported by the American Public Power Association, and from trade press coverage of a PG&E investor update. Both are dated in the text.
- Earthquake probability is the U.S. Geological Survey's published forecast, quoted with its time window.
- Building facts are from PeeringDB (with capture date) and the operators' own facility pages.
Sizes with no published figure are left without one. We recheck every source at least quarterly; this edition was read on November 26, 2026.
Sources used on SFColo
- Hurricane Electric, colocation (checked November 26, 2026)
- Monkeybrains, colocation (checked November 26, 2026)
- QuoteColo, San Jose colocation (November 2026)
- QuoteColo, 1U to 8U colocation (checked November 26, 2026)
- American Public Power Association, Silicon Valley Power and data centers (published March 5, 2026)
- Data Center Dynamics, PG&E connection pipeline (published June 24, 2024)
- Digital Realty, SFO10 (200 Paul Avenue) (checked November 26, 2026)
- Digital Realty, SFO12 (365 Main Street) (checked November 26, 2026)
- USGS Fact Sheet 2016-3020, Bay region earthquake outlook (published 2016, forecast for 2014 to 2043)
- National Conference of State Legislatures, data center incentives by state (updated April 1, 2026)
- Equinix, Silicon Valley data centers (checked October 2026)
- CoreSite, Silicon Valley (checked October 2026)
- Evocative, SJC3 Santa Clara (checked October 2026)
- QTS, Santa Clara (checked October 2026)
- Vantage Data Centers, Santa Clara II (checked October 2026)